Prem360 is how we work with you, in 10 steps across four stages: early engagement, detail design, onsite support and warranty. It runs in step with RIBA Stages 0 to 7 and the Building Safety Act Gateways in the UK, and with RIAI and BCAR in the Republic of Ireland.

Early engagement

Identifying risk early and designing it out, from RIBA Stages 2 and 3.

Step one

Your enquiry received.

Substructure drawing pack & SI report

Send us your drawings and site investigation report, and we review the ground conditions, water table, gas risk and heave requirements.

Step two

Pre-proposal meeting.

Understanding the complexity

We meet your team to understand the structure, its use and the constraints before we propose anything.

Step three

Design strategy proposal meeting.

Presenting our CSSW review & protection systems

We present a Design Strategy Proposal with the required Grades of waterproofing, PDF drawing mark-ups and budget guidance.

Step four

Design strategy development.

Adapting to an evolving design

As your design develops, so does our strategy, keeping the waterproofing coordinated through each change.

Detail design

One designer, one line of responsibility.

Step five

Premcrete design appointment.

Owning the design risk

A formal appointment adds your project to our £10M PI cover, and we take full liability for the waterproofing and gas protection design.

Step six

Project-specific technical design.

Getting down to the detail

Fully project-specific drawings, not typical details, with every interface, penetration and sequence coordinated. Supports your Gateway 2 submission.

Onsite support

Making sure what’s designed is what gets built.

Step seven

Project start up & training.

Ensuring competent installation of Premcrete-manufactured products

Your project is set up on Premtrac, and installers are trained before work starts.

Step eight

Installation & site support.

Site inspections & quality management

Regular site visits, pre-pour inspections and photographic records, logged in Premtrac.

Warranty

Standing behind the structure.

Step nine

Project completion & warranty.

The final paperwork

As-built records, Premtrac evidence for Gateway 3, and product, collateral and workmanship warranties.

Step ten

Post-completion support.

We’ve got your back

If anything goes wrong, we take responsibility for reaching a resolution and upholding the warranty.