Built on experience.
Driven by progress.
From a merchant to a manufacturer: forty years of protecting structures, and today a British manufacturer and waterproofing design specialist.
We started in 1986 as FIS, a distributor of construction chemicals and waterproofing brands. The Tuffin family acquired the business in 2005, launched the Premcrete brand in 2007 and began manufacturing in-house in 2014. Today we design, manufacture and support complete substructure protection systems, and own the design risk on every project.
Journey of discovery.
40 years protecting structures.
Our vision. To be the most trusted partner in protecting complex structures. Trusted means clients, contractors and consultants have confidence in our integrity, expertise and consistency. Partner means collaboration, not just a transaction: we work alongside engineers, architects and contractors as part of the solution.
Our mission. To protect structures, people, reputations and the networks that keep us moving. Every project ultimately serves people: the workers who build it, the people who use it and the communities around it. By getting protection right, our clients keep their credibility, and transport, utility and social networks keep running.
Our values. Integrity, passion and innovation. We act with integrity, our people are dependable and we stand behind our work. We are passionate about construction: its challenges, its pace and its purpose. And innovation is our backbone: we anticipate problems and design smarter solutions that make building faster, safer and more efficient.
Our point of difference. Protecting structures is just the start. We protect your reputation, your programme and your profit. We own the design risk and provide the technical clarity and engineering solutions that cut waste and drive project efficiency, from the first drawing to post-completion support.
Building progress from the ground up.
You are a company we like to do business with & we always receive calls from the office asking how things are & how was the service. Keep up the good work.
Contracts Manager
Contractor in Jersey
The challenges in construction. Today’s projects face four recurring risks: a lack of clear design responsibility, programme overrun and overspend, compliance with the Building Safety Act, and pressure to cut carbon. Each one lands hardest below ground, where defects are costly to reach and slow to fix.
Design responsibility. Too often liability for waterproofing is split between parties. We take full responsibility for waterproofing and ground gas design, backed by £10M Professional Indemnity, so there is one clear line of accountability from concept to completion.
Programme and compliance. Early engagement from RIBA Stages 2 and 3 designs out risk before it reaches site. Our processes support Gateway 2 submissions, and Premtrac provides the inspection records and Golden Thread evidence needed at Gateway 3.
Carbon. Manufacturing in Britain means shorter supply chains. Our systems support the retention of existing structures, lower-carbon concrete and polystyrene-free heave protection, cutting waste on site without compromising performance.