Prem360: end-to-end support.
Delivering detailed technical and commercial support to architects, consultants and contractors.
Prem360 is how we work with you, in 10 steps across four stages: early engagement, detail design, onsite support and warranty. It runs in step with RIBA Stages 0 to 7 and the Building Safety Act Gateways in the UK, and with RIAI and BCAR in the Republic of Ireland.
Early engagement
Identifying risk early and designing it out, from RIBA Stages 2 and 3.
Step one
Your enquiry received.
Substructure drawing pack & SI report
Send us your drawings and site investigation report, and we review the ground conditions, water table, gas risk and heave requirements.
Step two
Pre-proposal meeting.
Understanding the complexity
We meet your team to understand the structure, its use and the constraints before we propose anything.
Step three
Design strategy proposal meeting.
Presenting our CSSW review & protection systems
We present a Design Strategy Proposal with the required Grades of waterproofing, PDF drawing mark-ups and budget guidance.
Step four
Design strategy development.
Adapting to an evolving design
As your design develops, so does our strategy, keeping the waterproofing coordinated through each change.
Detail design
One designer, one line of responsibility.
Step five
Premcrete design appointment.
Owning the design risk
A formal appointment adds your project to our £10M PI cover, and we take full liability for the waterproofing and gas protection design.
Step six
Project-specific technical design.
Getting down to the detail
Fully project-specific drawings, not typical details, with every interface, penetration and sequence coordinated. Supports your Gateway 2 submission.
Onsite support
Making sure what’s designed is what gets built.
Step seven
Project start up & training.
Ensuring competent installation of Premcrete-manufactured products
Your project is set up on Premtrac, and installers are trained before work starts.
Step eight
Installation & site support.
Site inspections & quality management
Regular site visits, pre-pour inspections and photographic records, logged in Premtrac.
Warranty
Standing behind the structure.
Step nine
Project completion & warranty.
The final paperwork
As-built records, Premtrac evidence for Gateway 3, and product, collateral and workmanship warranties.
Step ten
Post-completion support.
We’ve got your back
If anything goes wrong, we take responsibility for reaching a resolution and upholding the warranty.