Gateway 2 is a hard stop: construction can’t start until the Regulator approves the design.

Book a design meeting

Speak to our team

What Gateway 2 is. For higher-risk buildings, Gateway 2 requires the full RIBA Stage 4 design to be submitted to the Building Safety Regulator before work starts on site. The Regulator must be satisfied that the design meets the Building Regulations.

Why waterproofing matters. Below-ground protection is one of the hardest elements to change once built. Water, gas and heave risks need to be designed out at Stage 4, with every interface and penetration coordinated, not left to site.

The cost of getting it wrong. An incomplete or uncoordinated submission can be rejected, and delays at Gateway 2 hold up the whole programme. Late changes after approval go through formal change control, adding time and cost.

Where we come in. We’ve supported many Gateway 2 applications. Our design team provides the waterproofing and gas protection design, drawings and specifications the submission needs, and takes responsibility for them.

And we’re in early discussions on hundreds more.

123

GW2 projects since 2024

42

approved and on site

54

awaiting approval

27

in design now

What you need at Gateway 2.

A competent designer

A suitably qualified waterproofing designer, such as a CSSW, appointed formally.

Clear design responsibility

Written acknowledgement of who owns the waterproofing and gas design.

Project-specific details

Coordinated drawings for every interface and penetration, not typical details.

Professional Indemnity

PI cover for all elements, including water and gas protection.

Certified products

Key products with BBA or BDA Agrément certification.

Change control

A process for managing and recording design changes during construction.

How Premcrete helps.

We own the design

100% design responsibility, backed by £10M PI.

CSSW-qualified team

Competent, recognised waterproofing designers.

Submission-ready drawings

Numbering, revisions and document control to suit your system.

Evidence through to Gateway 3

Premtrac carries the Golden Thread on site.

Frequently asked questions.

Does Gateway 2 apply to my project?

It applies to higher-risk buildings, generally those 18m or seven storeys and above with at least two residential units, plus some care homes and hospitals.

When should the waterproofing designer be appointed?

Before technical design, ideally at RIBA Stage 3, so the design is complete for the Stage 4 submission.

Can typical details be used?

The Regulator expects a coordinated, project-specific design. We produce full project-specific drawings.

What happens if the design changes after approval?

Changes go through formal change control. Our revision management and drawing protocols support this.

How does Gateway 2 link to Gateway 3?

Gateway 3 needs evidence the building matches the approved design. Premtrac records that evidence as installation happens.