Getting below-ground design
right before you build.
Gateway 2 is a hard stop: construction can’t start until the Regulator approves the design.
What Gateway 2 is. For higher-risk buildings, Gateway 2 requires the full RIBA Stage 4 design to be submitted to the Building Safety Regulator before work starts on site. The Regulator must be satisfied that the design meets the Building Regulations.
Why waterproofing matters. Below-ground protection is one of the hardest elements to change once built. Water, gas and heave risks need to be designed out at Stage 4, with every interface and penetration coordinated, not left to site.
The cost of getting it wrong. An incomplete or uncoordinated submission can be rejected, and delays at Gateway 2 hold up the whole programme. Late changes after approval go through formal change control, adding time and cost.
Where we come in. We’ve supported many Gateway 2 applications. Our design team provides the waterproofing and gas protection design, drawings and specifications the submission needs, and takes responsibility for them.
And we’re in early discussions on hundreds more.
123
GW2 projects since 2024
42
approved and on site
54
awaiting approval
27
in design now
What you need at Gateway 2.
A competent designer
A suitably qualified waterproofing designer, such as a CSSW, appointed formally.
Clear design responsibility
Written acknowledgement of who owns the waterproofing and gas design.
Project-specific details
Coordinated drawings for every interface and penetration, not typical details.
Professional Indemnity
PI cover for all elements, including water and gas protection.
Certified products
Key products with BBA or BDA Agrément certification.
Change control
A process for managing and recording design changes during construction.
How Premcrete helps.
We own the design
100% design responsibility, backed by £10M PI.
CSSW-qualified team
Competent, recognised waterproofing designers.
Submission-ready drawings
Numbering, revisions and document control to suit your system.
Evidence through to Gateway 3
Premtrac carries the Golden Thread on site.
Frequently asked questions.
Does Gateway 2 apply to my project?
It applies to higher-risk buildings, generally those 18m or seven storeys and above with at least two residential units, plus some care homes and hospitals.
When should the waterproofing designer be appointed?
Before technical design, ideally at RIBA Stage 3, so the design is complete for the Stage 4 submission.
Can typical details be used?
The Regulator expects a coordinated, project-specific design. We produce full project-specific drawings.
What happens if the design changes after approval?
Changes go through formal change control. Our revision management and drawing protocols support this.
How does Gateway 2 link to Gateway 3?
Gateway 3 needs evidence the building matches the approved design. Premtrac records that evidence as installation happens.