Colne Valley Viaduct
Epoxy bonding for the UK’s longest railway bridge.
Case studyProtecting structures is just the start. We protect your reputation, your programme & your profit.
Rail work happens in tight possessions, where a late handback means penalties and disruption. We supply rapid-set repairs, structural grouts, bonding adhesives and waterproofing that perform first time, backed by on-site support.
HS2
Colne Valley Viaduct
20
MPa in one hour
2–3
day UK delivery
CSSW
qualified support team
On HS2’s Colne Valley Viaduct, at 3.4km the longest bridge on the line, we supplied Eponite EP-T and the fast-curing EP-T VFC epoxy adhesives for hundreds of precast segments. Constant site presence, on-site training and just-in-time deliveries kept Align JV on target in variable conditions.
From the Dawlish sea wall to Network Rail lift shaft waterproofing, we bring the same approach to every rail asset: the right material, delivered on time, with technical support on site.
Premcrete do an excellent job of providing technical support to VSL on the HS2 project… Premcrete developed a new chemical formula for Epoxy Resin Eponite EP to fulfil site requirement… which allowed us to sort the unexpected issues on time with no delays to the project schedule.
Project Manager
VSL Systems UK Ltd
London
Epoxy bonding for the UK’s longest railway bridge.
Case studyDevon
A £30m scheme to protect a coastal railway line that washed into the sea eight years ago.
Case studyPLACEHOLDER – Network Rail lift shaft case study card: to be added once the project is supplied by Premcrete.
Yes. Alongside structural waterproofing and gas protection, we manufacture concrete repair mortars, grouts, sealants, coatings, admixtures and curing compounds for every type of project.