London
Setting the scene
The challenge
Citizen M contracted Balfour Beatty to help with rolling out a new chain in the UK offering affordable luxury. The nine-storey, 370-key hotel stands directly opposite the Tower of London a World Heritage site. Maximising space is important to Citizen M and a café, bar, restaurant and meeting spaces were included in the scheme as well as a landscaped café terrace overlooking the Roman ruins.
The turning point
Our solution
Although the building is directly above the Circle and District line a single-storey basement was designed beneath the building. Moortown Group Ltd won the contract for the groundworks package and asked Premcrete to design a system to fully waterproof the basement area which would win the approval of London Underground Limited. Premcrete designed a Type A Bentonite waterproofing system with Hydrostop BR waterbar. The system was approved by Moortown, LUL and Balfour Beatty. Premcrete then worked with the Moortown site team to keep control of the installation quality and give their client confidence in the waterproofing.
The impact
The result
PLACEHOLDER – impact/result copy to be supplied by Premcrete.
Location:
London
Year:
2014
Main Contractor:
Balfour Beatty
Architect:
Sheppard Robson
Type A:
Maxiprufe 2000
Type B:
Hydrocrete Watertight Concrete
Levels below ground:
1
Products used:
Maxiprufe Plus