Smugglers Way

Setting the scene

Hydrocarbons in the ground, homes on top

This new build construction was brought forward by Vistry Group and a dedicated team of experts to provide affordable apartments across 13 blocks, with three podiums and ranging in height between 8 and 16 storeys.

Designed to achieve exceptionally high standards, the apartments will have dual or treble aspect, with communal roof gardens and external courtyard amenity space at the first floor.

The three separate podiums and infills between the base of the buildings will contain the commercial space and residential services.

Smugglers way is an area undergoing rapid regeneration and boasts excellent travel links along Swandon Way; the main transport artery through South West London.

The turning point

No wrapped pile caps, no waiting


Requirements

Premcrete were instructed to assist with gas proofing and waterproofing solutions for this large scale project. The site was polluted with hydrocarbons in the soil, posing a risk of gas emissions. Traditional methods of overcoming this issue of course existed, yet the client had other ideas…

The client was opposed to the idea of wrapping the pile caps, which is a usual solution to the problem in hand. The reasoning for this centred around the project timeline; where the process of wrapping caps would extend the timeline in this scenario, hindering the backfilling of pile caps and leading to a potential wastage of membrane.

The impact

Caps cast and backfilled early

As no alternative solutions existed in the market to avoid the wrapping of caps, Premcrete were selected.

The Solution

The introduction of Hydroprufe LG, a liquid-applied epoxy based membrane, offered the satisfactory resistance to gas, VOCs, hydrocarbons and water. It has been stringently tested for coefficient of friction compliance to ensure structural engineer’s satisfaction – and this method eliminated the need for wrapping caps as required by the client, allowing for rapid casting and backfilling of pile caps before the membrane is brought to the site.

Location:

London

Year:

2024

Main Contractor:

Vistry Group

Architect:

Hawkins Brown

Structural Engineer:

Ramboll

Groundworks Contractor:

J Reddington

Type A:

Combi-Seal Plus, Hydroprufe LG

Type B:

Hydrocrete

Systems:

Combiseal Plus, Hydroprufe LG, Hydrocrete

Products used:

Hydroprufe LG, Combiseal Plus, Hydrocrete Admixture