Setting the scene
Equipment pits for the UK’s offshore wind future
This facility will be built on the 4.5 million sq ft offshore wind and industrial space, being created on 450 acres of land next to the wharf and heavy-lift South Bank Quay. The first phase of the quay was recently awarded £107 million of funding in the UK Infrastructure Bank’s first ever investment.
Premcrete was delighted to become involved at an early stage to provide waterproofing solutions for this large scale project.
The Challenge:
Equipment pits needed waterproofing within a tight installation program. Project timescales can often require speedy yet effective solutions, of which Premcrete are used to providing.
The turning point
Watertight concrete instead of extra trades
The Solution:
Premcrete provided watertight concrete, which offered the perfect solution – with its dual crystalline and pore-blocking properties, backed by our 25-year warranty.
This solution did not require additional labour time compared to standard concrete and incurred no additional labour costs.
Key Advantages:
The impact
No extra labour, backed by a 25-year warranty
- Full in-house design offered by CSSW designers.
- Design liability covered by £10 million PI insurance
- Dual crystalline and pore-blocking properties of the watertight concrete
- 25-year warranty without additional labour time or costs
Stakeholders on the Project:
Architect: Corstophine & Wright
Structural Engineer: WSP
Main Contractor: K2 Construction Management
Groundworks Contractor: MGL Group
Location:
Teesside
Year:
2024
Main Contractor:
K2 Construction Management
Architect:
Corstophine & Wright
Structural Engineer:
WSP
Groundworks Contractor:
MGL Group
Type B:
Hydrocrete, Cemflex VB, Hydrostop BR
Systems:
Hydrocrete, Cemflex VB, Hydrostop BR
Products used:
Hydrostop BR, Cemflex VB, Hydrocrete Admixture