Setting the scene
3.4km of precast segments, bonded on a deadline
The Colne Valley Viaduct is the longest bridge on HS2, spanning lakes and rivers across 3.4km. With precast segments going in every day, Align JV needed an epoxy that cured fast, stayed in place on vertical and overhead faces, and bonded consistently across hundreds of joints.
The turning point
An engineered bond line, backed on site
We supplied Eponite EP-T, a stable structural adhesive for standard conditions, and Eponite EP-T VFC, a very fast-curing grade for cooler weather. Both are thixotropic, so they apply without slump or drip.
Our team stayed on site to train operatives, and deliveries were timed to daily installation targets to avoid excess handling and storage.
The impact
A reliable bond line, on programme
Align JV maintained a high-performance segmental bond line across the viaduct, even under tight time constraints and changing weather.
Location:
HS2, Hillingdon, London
Year:
2023
Client:
HS2 Ltd
Main contractor:
Align JV (Bouygues Travaux Publics, Sir Robert McAlpine, VolkerFitzpatrick)
Engineer:
Jacobs / Ingerop
Systems:
Eponite EP-T, Eponite EP-T VFC