The Most Overlooked Risks in Waterproofing Design
When we think about waterproofing risk, it’s easy to focus on the big decisions.
Read articleAt Premcrete, we specialise in delivering fully scoped, accurate waterproofing quotes — not rough estimates. For us to design the right solution and give you a cost you can rely on, we need some essential project information upfront.
If you’re short on time, these six core items allow us to generate a detailed and reliable quote:
These figures give us the baseline quantities for membrane coverage, detailing requirements, and any gas protection considerations. From this, we can extrapolate the rest with a high degree of accuracy.

For high-risk buildings, Gateway 2 submissions, or where detailed design coordination is needed, we recommend providing the full set of structural and environmental details below — which includes and builds upon the six core items.


The SI report is critical not just for compliance — but for protection. If gas or hydrocarbon risks are present and unaccounted for, your system could fail prematurely, void warranties, or create compliance issues under BS 8102:2022 and the Building Safety Act.
That’s why we always request confirmation of gas/VOC risks before quoting. It directly impacts membrane choice, installation detailing, and the overall system warranty.

When we’re given clear, upfront data, we can provide:
You can start with the 6 core data points — or provide the full detail for a complete design review. We’re here to assist either way.