Reinventing the Royal Mail’s Mount Pleasant site
Bouygues UK has been appointed by Taylor Wimpey Central London to construct the first phase of Postmark, its redevelopment of the old Royal Mail sorting office at Mount Pleasant in Farringdon. The first phase, on which Bouygues has now started work under a £100m contract, is a 214-apartment complex called West Central 1, or WC1. The second phase is called EC1, reflecting that the development straddles two London postcodes.
The turning point
Protection designed around a historic site
Premcrete supported Bouygues UK with the design and supply of the structural waterproofing to the vast basement using a combination of Maxiprufe 2000, Maxiprufe Plus and Hydrocrete Watertight Concrete.
The impact
An iconic site, ready for its next chapter
PLACEHOLDER – impact/result copy to be supplied by Premcrete.
Location:
London
Year:
2020
Main Contractor:
Bouygues UK
Structural Engineer:
Terrell Consulting Engineers
Type A:
Maxiprufe 2000, Maxiprufe Plus
Type B:
Hydrocrete Watertight Concrete
Levels below ground:
2
Products used:
Maxiprufe Plus, Hydrocrete Admixture