22 Hanover Square

Setting the scene

The challenge

Clivedale’s redevelopment of 22 Hanover Square comprises 41 apartments, a 51-bedroom Five-Star hotel, a restaurant, and a spa with an indoor swimming pool. The project will be Mayfair’s only fully integrated serviced residential scheme.

The turning point

Our solution


This exclusive development includes a three-storey basement which was constructed by Erith Contractors. Premcrete worked closely with Erith to produce a compliant design that complemented the construction methods.

The impact

The result

PLACEHOLDER – impact/result copy to be supplied by Premcrete.

Location:

London

Year:

2018

Main Contractor:

Clivedale

Architect:

Arney Fender Katsalidis

Structural Engineer:

Ramboll

Type A:

Maxiprufe Plus

Type B:

Hydrocrete Watertight Concrete

Type C:

Hydroflow HP Cavity Drain

Levels below ground:

3

Products used:

Hydroflow HP, Maxiprufe Plus, Hydrocrete Admixture

PLACEHOLDER

Project testimonial to be supplied by Premcrete.

Related case studies