Colne Valley Viaduct

Setting the scene

3.4km of precast segments, bonded on a deadline

The Colne Valley Viaduct is the longest bridge on HS2, spanning lakes and rivers across 3.4km. With precast segments going in every day, Align JV needed an epoxy that cured fast, stayed in place on vertical and overhead faces, and bonded consistently across hundreds of joints.

The turning point

An engineered bond line, backed on site


We supplied Eponite EP-T, a stable structural adhesive for standard conditions, and Eponite EP-T VFC, a very fast-curing grade for cooler weather. Both are thixotropic, so they apply without slump or drip.

Our team stayed on site to train operatives, and deliveries were timed to daily installation targets to avoid excess handling and storage.

The impact

A reliable bond line, on programme

Align JV maintained a high-performance segmental bond line across the viaduct, even under tight time constraints and changing weather.

Location:

HS2, Hillingdon, London

Year:

2023

Client:

HS2 Ltd

Main contractor:

Align JV (Bouygues Travaux Publics, Sir Robert McAlpine, VolkerFitzpatrick)

Engineer:

Jacobs / Ingerop

Systems:

Eponite EP-T, Eponite EP-T VFC