Setting the scene
The challenge
The Mount Coffee Hydroelectric Power Plant was built in the 1960s, was damaged during Liberia’s civil war and has been unable to generate power since the 1990s. However, in 2015 Dawnus Construction secured the main civil works package valued at £38M which includes the reconstruction and rehabilitation of the main dam, powerhouse, spillway and intake, as well as infrastructure and road works.
The turning point
Our solution
Premcrete supplied Dawnus with a number of concrete repair products, floor screeds, epoxy coatings, and waterproofing products.
The impact
The result
PLACEHOLDER – impact/result copy to be supplied by Premcrete.
Location:
Liberia
Year:
2013
Main Contractor:
Dawnus Construction
Type A:
Eponite GP, Eponite HB
Type B:
Epocote SF, Preflex 300
Type C:
Premtop 720
Levels below ground:
2
Products used:
Preflex 300, Eponite GP
PLACEHOLDER
Project testimonial to be supplied by Premcrete.