The challenge

The Mount Coffee Hydroelectric Power Plant was built in the 1960s, was damaged during Liberia’s civil war and has been unable to generate power since the 1990s. However, in 2015 Dawnus Construction secured the main civil works package valued at £38M which includes the reconstruction and rehabilitation of the main dam, powerhouse, spillway and intake, as well as infrastructure and road works.

The turning point

Our solution


Premcrete supplied Dawnus with a number of concrete repair products, floor screeds, epoxy coatings, and waterproofing products.

The impact

The result

PLACEHOLDER – impact/result copy to be supplied by Premcrete.