Postmark London

Setting the scene

Reinventing the Royal Mail’s Mount Pleasant site

Bouygues UK has been appointed by Taylor Wimpey Central London to construct the first phase of Postmark, its redevelopment of the old Royal Mail sorting office at Mount Pleasant in Farringdon. The first phase, on which Bouygues has now started work under a £100m contract, is a 214-apartment complex called West Central 1, or WC1. The second phase is called EC1, reflecting that the development straddles two London postcodes.

The turning point

Protection designed around a historic site


Premcrete supported Bouygues UK with the design and supply of the structural waterproofing to the vast basement using a combination of Maxiprufe 2000, Maxiprufe Plus and Hydrocrete Watertight Concrete.

The impact

An iconic site, ready for its next chapter

PLACEHOLDER – impact/result copy to be supplied by Premcrete.

Location:

London

Year:

2020

Main Contractor:

Bouygues UK

Structural Engineer:

Terrell Consulting Engineers

Type A:

Maxiprufe 2000, Maxiprufe Plus

Type B:

Hydrocrete Watertight Concrete

Levels below ground:

2

Products used:

Maxiprufe Plus, Hydrocrete Admixture

PLACEHOLDER

Project testimonial to be supplied by Premcrete.

Related case studies