London
Setting the scene
The challenge
Steeped in history, Taxi House is the transformation of the former London Taxi Drivers’ Association headquarters on Woodfield Road, Westminster into a new waterside destination on the Grand Union Canal.
The project comprises of a mixed-used development on this canal side site, delivering 332 modern serviced accommodation rooms, commercial and retail space – which is also set to be utilised by community groups creating a new public realm.
The turning point
Our solution
Premcrete were instructed to help with the project and to overcome initial challenges surrounding the proposed work. The main challenge was that the client and groundworker were averse to wrapping pile caps, as terminating a membrane at the edge of the pile caps often lacks adequate horizontal concrete surface for effective termination. In this regard, it is not uncommon for structural engineers to design the distance from the edge of the rebar to the edge of the pile cap at only 30-50mm, making the termination detail more intricate and challenging.
The Solution
The impact
The result
As an alternative to wrapping, Premcrete provided a solid solution using Hydroprufe LG – as well as addressing the termination strip issue. This was completed by advising the groundworker to ‘overcast’ the pile caps, creating a 150mm space from the edge of the rebar to the edge of the pile cap. This approach was found to significantly improve installation efficiency and ease, resulting in a smoother overall process and a very happy client!
Taxi House is set to complete in the Spring of 2025 and has a contract value of £52.5m.
Location:
Westminster, London
Year:
2023
Main Contractor:
McAleer & Rushe
Architect:
AHMM
Structural Engineer:
MCR Consulting Engineers
Groundworks Contractor:
Carty Ford
Type A:
Combi-Seal Plus, Hydroprufe LG
Type B:
Hydrocrete
Systems:
Combiseal Plus, Hydroprufe LG, Hydrocrete
Products used:
Hydroprufe LG, Combiseal Plus, Hydrocrete Admixture