London
Setting the scene
The challenge
PBT (Proton Beam Therapy) is an advanced form of radiotherapy used for the treatment of complex and hard-to-beat cancers in children and adults. Previously patients had to travel abroad for PBT, but now patients can benefit from local access to this advanced treatment at UCLH with potentially better outcomes and lower risk of long-term side effects. Premcrete supported Bouygues UK to produce a detailed design for the structural waterproofing for this 5-storey basement.
The turning point
Our solution
The construction comprised of a 2-metre-thick raft slab and diaphragm walls around the perimeter. At nearly 30 metres deep, the basement required careful detailing and monitoring of workmanship. Maxiprufe Plus was used as a Type A waterproof membrane beneath the raft slab. The diaphragm walls were then protected using a Type C Cavity Drain Membrane system.
The impact
The result
PLACEHOLDER – impact/result copy to be supplied by Premcrete.
Location:
London
Year:
2017
Main Contractor:
Bouygues UK
Architect:
Scott Tallon Walker Architects
Structural Engineer:
Aecom
Type A:
Maxiprufe Plus, Hydrorend, Hydroseal FX
Type B:
Hydroflow Cavity Drain System
Levels below ground:
5
Systems:
Maxiprufe Plus, Hydroflow, Hydrorend, Hydroseal FX
Products used:
Maxiprufe Plus, Hydroseal FX
PLACEHOLDER
Project testimonial to be supplied by Premcrete.