London
Heathrow Tunnel
Premcrete assisted BAM Nuttall on the Heathrow Tunnel project to undertake refurbishment work on the main and cargo access tunnels to the airport.
Case study
Setting the scene
Delta Junction is one of the most complex parts of the HS2 route, where the new high-speed railway weaves through existing infrastructure, rivers, and rural landscapes. The project required the installation of hundreds of precast segments in highly sequenced operations — with minimal tolerance for delay or waste.
The contractor required a segmental bonding adhesive that would:
The turning point
THE SOLUTION
Premcrete delivered a site-optimised epoxy system and support package tailored to Delta Junction’s unique demands. This included:
The impact
Our technical presence and ability to rapidly tailor material solutions helped keep this critical phase of the HS2 infrastructure programme on track, while setting a new standard in segmental bonding performance.
Year:
2024
Main Contractor:
Balfour Beatty VINCI JV
Architect:
HS2 Ltd
Structural Engineer:
Mott MacDonald/Systra
Project testimonial to be supplied by Premcrete.
London
Premcrete assisted BAM Nuttall on the Heathrow Tunnel project to undertake refurbishment work on the main and cargo access tunnels to the airport.
Case studyDevon
A £30m scheme to protect a coastal railway line that washed into the sea eight years ago.
Case studyLondon
London