Heathrow Tunnel

Setting the scene

The challenge

Heathrow Airport has awarded BAM Nuttall a contract valued at more than £85m to undertake refurbishment work on the main and cargo access tunnels to the airport.

The turning point

Our solution


Part of the refurbishment works was to carry out concrete repairs to the spalled concrete using an R4 Structural Mortar in accordance with BS EN1504.

The impact

The result

Premcrete supplied BAM Nuttall with Teknocem S which met the performance specification.

Location:

London

Year:

2015

Main Contractor:

BAM Nuttall

Type A:

Teknocem S

Products used:

Teknocem S