The Spire

Setting the scene

The challenge

Challenges were faced with an exceptional level of gas risk combined with the need to protect against contaminated ground conditions. Through detailed engagement FIS were glad to introduce industry expertise which helped to rationalise the level of risk across the project, therefore enabling a practicable design solution to be incorporated.

The turning point

Our solution


Hydrocrete Watertight Concrete was used throughout the entire substructure, with Combi-Seal Plus being designed to provide combined Gas, VOC and Waterproofing Protection to the Grade 3 zones of the environment and was also adopted for use within the Grade 2 car park to future-proof its use.

The impact

The result

PLACEHOLDER – impact/result copy to be supplied by Premcrete.

Location:

London

Year:

2018

Main Contractor:

Greenland

Architect:

HOK Architects

Structural Engineer:

Aecom

Levels below ground:

2 Storeys

Products used:

Hydrocrete Admixture

PLACEHOLDER

Project testimonial to be supplied by Premcrete.

Related case studies