Setting the scene
The challenge
Challenges were faced with an exceptional level of gas risk combined with the need to protect against contaminated ground conditions. Through detailed engagement FIS were glad to introduce industry expertise which helped to rationalise the level of risk across the project, therefore enabling a practicable design solution to be incorporated.
The turning point
Our solution
Hydrocrete Watertight Concrete was used throughout the entire substructure, with Combi-Seal Plus being designed to provide combined Gas, VOC and Waterproofing Protection to the Grade 3 zones of the environment and was also adopted for use within the Grade 2 car park to future-proof its use.
The impact
The result
PLACEHOLDER – impact/result copy to be supplied by Premcrete.
Location:
London
Year:
2018
Main Contractor:
Greenland
Architect:
HOK Architects
Structural Engineer:
Aecom
Levels below ground:
2 Storeys
Products used:
Hydrocrete Admixture
PLACEHOLDER
Project testimonial to be supplied by Premcrete.
Related case studies
London
Holborn Viaduct
Case studyDelta Junction: HS2 High-Speed Rail Project
Case studyLondon
Colne Valley Viaduct
Epoxy bonding for the UK’s longest railway bridge.
Case study