Work has commenced on a £30m scheme to protect a coastal railway line that washed into the sea eight years ago. A new 25ft (7.5m) high sea wall is being built at Dawlish, Devon after the line collapsed during storms on 4 February 2014. The track which links Devon and Cornwall with the rest of the country was left dangling in the air after waves gouged out holes in the defences. Network Rail aims to “secure the future of the line for the next 100 years”.
The turning point
Our solution
Premcrete worked with BAM Nuttall to design and supply a unique neoprene sealing system between adjacent precast segments. Premcrete also supplied Teknocem LA with a high-strength micro-concrete for securing the base of the segments.
The impact
The result
PLACEHOLDER – impact/result copy to be supplied by Premcrete.
Location:
Devon
Year:
2020
Main Contractor:
BAM Nuttall
Architect:
Network Rail
Structural Engineer:
Arup
Type A:
Teknodure TS-F
Type B:
Teknocem HBR
Type C:
Preflex 300, Exafoam EN
Systems:
Teknocem LA, Teknodure TS-F, Preflex 300
Products used:
Teknodure TS-F, Teknocem LA, Teknocem HBR, Preflex 300
PLACEHOLDER
Project testimonial to be supplied by Premcrete.
Related case studies
London
Heathrow Tunnel
Premcrete assisted BAM Nuttall on the Heathrow Tunnel project to undertake refurbishment work on the main and cargo access tunnels to the airport.
Case studyLondon
Belgrove House
Case studyLondon