Setting the scene
A two-level basement in the heart of King’s Cross
Located at the centre of the Knowledge Quarter opposite the iconic King’s Cross and St. Pancras train stations in Camden, Belgrove House is set to become a new specialised office and laboratory building for the life sciences sector.
The scheme is designed to be innovative, highly sustainable and an example of carbon emissions reduction in construction.
The turning point
British-made membrane, made in our Andover HQ
The Challenge
- Reducing carbon emissions and considering the existing structure and links to the existing underground were challenging: particularly when it came to the design.
The impact
Lower carbon, with no international imports
The Solution
- Premcrete’s in-house design team uncovered the best solution possible for the waterproofing needs of the substructure.
- By utilising Maxiprufe Plus in particular (manufactured on site at Premcrete’s HQ), reduced carbon emissions by cutting out international imports.
Location:
London
Year:
2024
Main Contractor:
Mace
Architect:
AHMM
Structural Engineer:
AKT II
Groundworks Contractor:
GetJar
Type A:
Maxiprufe Plus
Type B:
Hydrocrete
Type C:
Hydroflow HP
Levels below ground:
2
Products used:
Hydroflow HP, Maxiprufe Plus, Hydrocrete Admixture
PLACEHOLDER
Project testimonial to be supplied by Premcrete.
Related case studies
Delta Junction: HS2 High-Speed Rail Project
Case studyLondon
Colne Valley Viaduct
Epoxy bonding for the UK’s longest railway bridge.
Case studyLondon