Delivering 928 affordable homes, the largest development in the Guinness Partnership’s 13-year history, this project connects efficiently to Leeds city centre – helping to create a unique sense of place for those who will live and work in the neighbourhood.
The Challenge:
The turning point
Our solution
- The basement car park required a Grade 1b waterproof membrane as per NHBC standards.
- Ensuring a reliable single form of protection whilst dealing with the complex requirements of a large-scale affordable housing project.
The Solution:
The impact
The result
- We utilised Maxiprufe Plus, our self-healing membrane renowned for its lightweight, durable and easy-to-install properties. This provided an ideal solution, offering long-lasting waterproofing and effectively adapting to structural movements.
- Hydrocrete was also used to enhance the robustness of the waterproofing system, ensuring maximum protection against water ingress.
- Our solution not only met the stringent NHBC standards, but also facilitated a smoother installation process, saving time and reducing costs.
Location:
Leeds
Year:
2024
Main Contractor:
United Living
Architect:
DK Architects
Structural Engineer:
Rosco
Groundworks Contractor:
4D Structures
Type A:
Maxiprufe Plus
Products used:
Maxiprufe Plus, Hydrocrete Admixture
PLACEHOLDER
Project testimonial to be supplied by Premcrete.
Related case studies
London
Holborn Viaduct
Case studyDelta Junction: HS2 High-Speed Rail Project
Case studyLondon
Colne Valley Viaduct
Epoxy bonding for the UK’s longest railway bridge.
Case study